Wacker HCLPTFE-lined piping, such as the equipment installed in the HCl regeneration unit, requires a retorquing of flange bolts to minimize leakage from bolt relaxation. The retorquing involves bringing the processing unit to operating temperature, allowing it to cool to ambient temperatures, and retorquing to the set value. As the original equipment manufacturer (OEM) describes:

A retorque should be applied within 24 hours of the initial torque or after the first thermal cycle. This allows for seating of the plastic and for relaxation of the bolts.  If the system is to perform at elevated temperatures, it is recommended that hot water be circulated at the maximum operating temperature of the process (if possible) for a minimum of 24 hours. This allows for the pipe system to experience one thermal cycle. After cool-down, retorquing of the system should be done.

Some Wacker personnel would refer to this method of re-torquing PTFE-lined fittings as “hot torquing,” while others used the term to mean torque of flanges at live operating conditions. This term was not documented in any official Wacker policy or procedure but was used as vernacular among Wacker personnel.

As the final report states...

 

You have no rights to post comments

 
View 's profile on LinkedIn

 

 LinkedIn Group Button

facebookIcon

 

Partner Organizations

 Chlroine Institute Logo 100 years

I am proud to announce that

The Chlorine Institute and SAFTENG

have extended our"Partners in Safety" agreement

for another year (2025)

CI Members, send me an e-mail

to request your FREE SAFTENG membership

 

RCECHILL BW

  

kemkey logo

OHS Solutions logoCEMANE power association logo

 EIT LOGO

 

Member Associations

ASME logo

 

Screen Shot 2018 05 28 at 10.25.35 PM

aiche logo cmyk highres

Chlorine institute

 nfpa logo.5942a119dcb25

 

TOCAS

 

BLR Logo 2018

 

 

 

 

safteng man copy

 

 organdonor